Service area/West University
Where we work
Construction consulting in West University Place, Texas.
West University Place is its own city inside Houston, and it runs its own building department. That means the permit, the plan review and the inspections all happen at one counter on Amherst, on that city’s schedule, not at the Houston Permitting Center.
It is a small city with a lot of construction in it, on 25 and 50 foot lots, and most projects are additions, second-storey work and gut renovations. The scope is tight, the neighbours are close, and the paperwork is unforgiving.
We cover West University across ZIP codes 77005 and 77030.

Approvals
One city, one permit counter, plenty of moving parts.
Every construction, enlargement, alteration, repair or demolition in West University Place needs a permit from the Community Development Department before work starts, and applications are made in person at 3826 Amherst Street. Plan review checks structural integrity, energy compliance under the adopted codes, and fire and life safety, with separate permits for plumbing, electrical, mechanical, fencing and pools.
Trees are the part owners do not see coming. A project that affects trees triggers a tree disposition review by the city’s urban forester before the permit is issued, and that review sits on the critical path with everything else.
- ◇Permits issued by the City of West University Place, not the City of Houston
- ◇In-person application at the Community Development Department on Amherst Street
- ◇Plan review covering structure, energy code and fire safety, with separate trade permits
- ◇Tree disposition review by the urban forester when a project affects trees
Start here
Know the cost before you hire.
Tell us about the house and what you are planning. Start with a free 20-minute intro call, no pressure. Or book a prepaid appointment and pick what suits you: a site visit, a Zoom session, or a phone call.
Consulting is advice based on the documents provided and is not legal advice or a real estate inspection.
On the job
Additions on tight lots, priced properly.
Most West University work is an addition or a rework of an existing house rather than a clean new build, which means the bids have to cover what happens when a wall comes down and the framing behind it is not what the drawings assumed. That contingency is legitimate. A bid with no allowance for it is not being honest, it is being cheap on paper.
The other recurring problem is scope drift between trades: the framing package priced one way, the finish schedule sold another, and nobody writing down who owns the drywall repair after the electrician leaves.
- ◇Whether the bid carries a real contingency for opening up an existing house
- ◇Scope boundaries between trades, written down rather than assumed
- ◇Allowances for tile, plumbing fixtures and cabinetry at the level of the house
- ◇A schedule that includes the permit and tree review, not just the build

Where we are called in
Where we are usually called in.
- 01
Before you buy or list: what the repairs and the remodel actually cost, so the number in the negotiation is a real number.
- 02
Before you sign: a line-by-line read of the bids against the plans, including what each one leaves out.
- 03
During the build: periodic walks of the work against the approved scope, and a written record of what was found.
Services that fit here
Questions
- Does West University Place issue its own building permits?
- Yes. West University Place is a separate city with its own Community Development Department and permit counter at 3826 Amherst Street. Houston permits do not cover work inside the city limits of West University Place.
- What is the tree review I keep hearing about?
- A project that affects trees on the property goes through a tree disposition review by the city urban forester before a permit is issued. It is a separate step from plan review and it can affect the schedule.
- Can you help with a pre-listing or pre-purchase cost review in West University?
- Yes. For sellers and realtors that is usually a walkthrough with reliable repair costs. For buyers it is a cost review before the option period closes.
Free 20-minute call
Talk to a builder about a West University project.
Free 20-minute intro call. 20 minutes. Tell us about the house and what you are planning.
Or book a prepaid appointment and choose what suits you: a site visit, a Zoom session, or a phone call. Payment confirms the booking.
- Call or text
- Call (281) 330-2428Text us
- Office
- 7111 Ave K St, Houston, TX 77011
